 Agile independent makes a big play with a small organization:With Help from William Jacob Management, a nimble   Texas-based independent has seized the opportunity to reopen Alaska's Cook Inlet   to new development for the first time in twenty (20) years. Virtually overnight, the small firm was able to ramp up with William Jacob Management as its full-service Design group for the design of an Offshore Well Test Facility (Monopod), Onshore Separation Plant and Tie-ins for future production and pipeline. Along with providing estimates, complete Design and bid preparation, the William Jacob Management team is working closely with state agencies to meet permitting requirements.      
                
                  | Project Name | Kitchen Lights / Cook Inlet Basin, Gas Development  |  
                  | Client | Escopeta Oil Company, Clear Lake, Texas / Furie Operating of Alaska, LLC |  
                  | Fabrication Location | State Services - Ingleside, Texas |  
                  | Install Location | Cooks Inlet, Alaska |  
                  | Start - Completion | 2012 - July 2014 |  
                  | Project Description  | 
                      
                        | » | Offshore  Platform with utilities to support Drilling and Well Testing  |  
                        | » | Onshore Separation Facility designed for 100  MMSCF/D and 8000 BLP/D  |  
                        | » | Final  Separation, Compression, Produced Water Disposal, Dehydration and Sales Gas  Metering Tie-in. Design includes future oil production and pipeline |  
                        | » | PLC  Communication between Offshore Test Facility and Onshore Separation Plant. |  
                        | » | Production  equipment enclosed in climate control buildings. |  |  
                  | Scope of Work | 
                    
                      | » | AFE  Estimate  |  
                      | » | Equipment  Arrangement  |  
                      | » | Process  Flow Diagrams  |  
                      | » | Permit  Documents  |  
                      | » | Facility  Bid Packages  |  
                      | » | Interconnect  Piping Design  |  
                      | » | Electrical  Design  |  
                      | » | Instrument  Control System / PLC   |  
                      | » | Civil  / Structural Design  |  
                      | » |  Work  Over Drilling Rig |  |  
                  | Project Manager | John Weaver |  
                  | Design Animation | » Onshore Processing Plant Design» Offshore Monopod Design
 |  |